Replacing the boiler
Single or cascaded condensing boilers, sized on the building's actual demand rather than on the output of the one being removed.
Businesses and apartment buildings · Boiler rooms
Renewals, upgrades and compliance work
We rebuild communal and commercial boiler rooms: boilers, manifolds, pumps, safety devices and controls, with the documentation required. We work for building managers, contractors and technical departments, scheduling the work outside the heating season wherever possible.
What we do
Single or cascaded condensing boilers, sized on the building's actual demand rather than on the output of the one being removed.
Renewal of the plant room pipework with accessible manifolds, isolating valves on every circuit and variable-speed circulating pumps.
Safety valves, expansion vessels, gas detection, ventilation and drains: all essential for the plant to pass inspection without issues.
Weather compensators, outdoor sensors and time programming by zone, with the option of remote access for the building manager or the maintenance contractor.
Meters and zone valves to allocate consumption between the units, including reworking the distribution where needed.
Insulated and labelled pipework, tags on the circuits, a schematic posted in the plant room: whoever comes after us should understand the system in five minutes.
Before the quotation
In a plant room the quotation depends on what is already there and how long the system can be off. Those are the two questions we start from.
Installations we have built
Circuits that can be isolated one by one, labelled pipework and room to work on it again in ten years' time.
Out of season the system can stay off for as long as needed. During the season the work is phased, or a temporary boiler is used: we agree this with the building manager before starting.
Yes. We prepare the quotation in the form needed for the condominium owners’ meeting, with the items broken out, and we deal with the building manager throughout the work.
Yes: heat meters and zone valves, including reworking the distribution where the system runs on rising mains.
Yes: declaration of conformity (dichiarazione di conformità), updated schematics and documentation for the components installed, handed over at the end of the job.
For operation and periodic checks we rely on the official service centres for the boilers installed; we remain the point of reference for the system itself.
We work for businesses, apartment buildings, builders and designers throughout the province of Lecco.
Request a site visit
Send us an email and we will get back to you to understand the work and arrange a site visit where one is needed. If you would rather talk it through straight away, give us a call.
+39 339 487 5349 Strada Statale 95-95/A — 23826 Mandello del Lario (LC)Tap the button: your email program opens with our address, the subject line and a few lines to fill in (where the property is, your phone number, a description of the work). You can edit or rewrite them however you like.
Email usOr write directly to alessandra@castelnuovoimpianti.it
Would you rather talk it through now? +39 339 487 5349 · WhatsApp