New underfloor systems
Insulation panel, pipework laid at varying spacing and the screed: closer spacing along cold walls and under glazing, where more output is needed.
Home services · Underfloor heating
New builds and renovations
We build low-temperature underfloor systems: panels, manifolds, room-by-room controls and pressure testing before the screed goes down. They work well with a condensing boiler and are at their best paired with a heat pump.
What we do
Insulation panel, pipework laid at varying spacing and the screed: closer spacing along cold walls and under glazing, where more output is needed.
Where there is little height available there are low-profile systems. It is assessed case by case: door heights, thresholds and the condition of the sub-floor.
Each room has its own circuit and actuator: you can set the bedroom without having to heat the whole house the same way.
Underfloor heating runs at 30–35 °C instead of 60–70: that is the condition in which a heat pump really performs. If the heat source may also be replaced, this should be considered at the design stage.
The system is put under pressure before the screed and monitored while it is poured: it is the only moment when a mistake can be put right without breaking anything up.
A gradual start-up cycle before the floor covering is laid, with the record that wood and tile fitters ask for.
Before the quotation
Underfloor heating is not always the right choice: in some renovations, the cost is disproportionate to the benefit. We say so beforehand, not once work has started.
Systems we have built
The part of the system that decides how the house will be heated for the next thirty years is only visible for a few days.
Yes, with low-profile systems, but it is still a building job: the floor has to come up, levels have to be checked and doors often need trimming. At the site visit we will say whether it is worth it.
It depends on the screed: after curing there has to be a gradual commissioning cycle, which normally means a few weeks between pouring and laying.
We check that the wood is compatible with the underfloor system and with the manufacturer's instructions before it is laid: the boards must be certified for underfloor heating and the flow temperature must stay within the limits specified.
It can cool, but only with humidity control: without dehumidification there is a risk of condensation on the floor. That is a decision to take at design stage, not afterwards.
In the same house yes, because it runs at low temperature: the advantage grows a great deal when the heat source is a heat pump or a well-adjusted condensing boiler.
We work in Mandello del Lario, in Lecco and throughout the province: from the lakeside to the Brianza lecchese, the Valsassina and the Valle San Martino.
Request a site visit
Send us an email and we will get back to you to understand the work and arrange a site visit where one is needed. If you would rather talk it through straight away, give us a call.
+39 339 487 5349 Strada Statale 95-95/A — 23826 Mandello del Lario (LC)Tap the button: your email program opens with our address, the subject line and a few lines to fill in (where the property is, your phone number, a description of the work). You can edit or rewrite them however you like.
Email usOr write directly to alessandra@castelnuovoimpianti.it
Would you rather talk it through now? +39 339 487 5349 · WhatsApp